PT. ABS services in lightning protection system: consulting services, installation design, maintenancePlease tell us what you think about our web site, company, products, or services.About PT. Aman Berkah Sejahtera (ABS)PDF file contain technical and general specification or Erico's productPT. ABS customise and product implementation referencesPT. ABS services in lightning protection system: consulting services, installation design, maintenancePhoto galleryLightning protection product consist of System 3000 (external protection), Critec (internal protection, Grounding SystemErico's six point plan, total solutions for lightning protection system in accordance of international standard
Method and lightning protection system by System 3000 in oil and gas application Method and lightning protection system by System 3000 in telcom application Method and lightning protection system by System 3000 in industrial application Method and lightning protection system by System 3000 in mining application
Thunder days per year
Argentina 30 - 80
Brazil 40 - 200
Hongkong 9 - 100
Indonesia 180 - 260
Malaysia 180 - 260
Singapore 160 - 220
Thailand 90 - 200
 
Photo's Gallery


RESEARCH

Lightning Research Station (1) of Institut Teknologi Bandung (I.T.B) at Mnt. tangkuban Perahu - Indonesia

Testing of early streamer emmision system (E.S.E) at 30m high tower as external lightning protection system at lightning research station (1) of Institut Teknologi Bandung (I.T.B) Mnt. Tangkuban Perahu - Indonesia Testing of early streamer emmision system (E.S.E) at 100m high tower as external lightning protection system at lightning research station (2) of Institut Teknologi Bandung (I.T.B) at Radio Repeater Station - Pertamina P.K.K

 

OIL & GAS



TELCOM

The Dynasphere is prepared on the roof - upper termination and ERICORE are attached, finial is screwed into place and FRP mast fitted The Dynasphere is elevated into position and installed by securing the insulated FRP mast alongside the antenna support mast using U bolts Upper installation complete ERICORE down conductor cable routed to the ground using the most direct path. Note the smooth curves to reduce inductance.
Trenching to ground rod system Preparation of the ERICORE downconductor cable to effect the lower termination Outer copper sheath and inner copper conductor are exposed. HV dielectric is removed and metalic conductors twisted together A metal sleeve is inserted over the copper sheath and inner copper current carrying conductors
The sleeve is inserted into the graphite mold and the mold is placed over the ground rod CADWELD exothermic weld completed Apply mastic tape so as to cover joint and prevent water egress up the cable sheath through capillary action The Lightning Event Counter (LEC) is secured to the ERICORE down conductor



BUILDING


 

Contact Us  |  Site Map |