DOWNCONDUCTORS
- Point 2 of Six Point Plan
Once lightning has been capture, the
discharge current must be conducted safety to ground with minimal
risk from "sideflashing"
ERITECH System 3000 ERICORE
Purpose design downconductor |
|
1. Plastic filler to increase effective diameter of
core conductor
2. Main conductor
3. Semi-conductive stress control layer
4. Polyeyhylene HV Insulation.
Semi conductive stress control layer
5. Electrically conductive plastic sheath
6. Electrically conductive plastic sheat |
|
|